The Rev 1 stack from pre 1994 has reached the end of sail viability so the plan was to Stack the 2007 JMH Rev 1 set and also do the 2007 JMH 1.5 set. The initial run of connecting lines was done here at Dieppe 2016 in the pink polyester sleeved kevlar line as in this image.